Michel Lagacé, Préfet of the Rivière-du-Loup MRC : "We are obviously very happy that this project was accepted. It represents not only a wonderful opportunity for our region, but also and especially for the two municipalities where the wind farm will be built. Substantial local benefits are anticipated and will be fantastic development springboards for these two devitalized communities."
As Michel Letellier, President and CEO of Innergex, explains: "The collaboration between Innergex and the Rivière-du-Loup MRC is excellent and we expect the relationship to remain harmonious as we carry out the Viger-Denonville Community Wind Farm Project."
A community wind farm project with a total capacity of 24.6 MW
The Viger-Denonville Community Wind Farm Project will be located in the municipalities of Saint-Paul-de-la-Croix and of Saint-Épiphane, in the region of Bas-Saint-Laurent, in the province of Québec. The Project will be comprised of 12 wind turbines with a total installed capacity of 24.6 MW. Under the terms of the partnership, the MRC and Innergex will each have a 50% equity interest in the project. The 12 wind turbines will be located between the 3rd RR West and the 5th RR West in Saint-Paul-de-la-Croix, and south of 4th RR East in Saint-Épiphane.
Innergex, founded 20 years ago, has a solid experience in the development of wind energy projects in Québec. Innergex already operates three wind farms through its participation in Cartier Wind Energy. Located in Baie-des-Sables, L’Anse-à-Valleau, and Carleton, in the Gaspé Peninsula, these projects have a total installed capacity of 319.5 MW (121 MW net). Three other wind farms are under construction: Gros Morne (Phases I and II) and Montagne-Sèche, which will have a total installed capacity of 270 MW (103 MW net). Innergex’s interest in all these projects is 38%, for a net total installed capacity of 224 MW.
The Rivière-du-Loup MRC is an autonomous entity encompassing several municipalities, which was created on January 1st, 1982, pursuant to the Act Respecting Land Use Planning and Development. Its administrative boundaries enclose a territory extending over 1,267.45 km2, comprised of 13 local municipalities with a total of 34,299 residents.
Innergex Renewable Energy Inc. is a leading developer, owner and operator of run-of-river hydroelectric facilities and wind energy projects in North America. Innergex’s management team has been involved in the renewable power industry since 1990. Innergex owns a portfolio of projects which consists of: i) interests in 17 operating facilities with an aggregate net installed capacity of 326 MW; ii) interests in 7 projects under development or under construction with an aggregate net installed capacity of 203 MW for which power purchase agreements have been secured; and iii) prospective projects of more than 2,000 MW (net).