Wind energy: Vestas signs first wind turbines order for V110-2.0 MW in Europe

40 MW wind farm in Poland is first to deploy Vestas’ V110-2.0 MW wind turbine in Europe.

Located in the Gdansk region of northern Poland, the Ostazewo project includes delivery, installation, and commissioning of the turbines, which is expected to occur during the fourth quarter of 2014.

The project also includes a 15-year Active Output Management (AOM) 4000 service contract. AOM 4000 is a comprehensive service package including all necessary main components and material to maximise uptime and performance.

The customer SPV – Nowotna Farma Wiatrowa and its parent company Taiga Mistral have been advised in this project by Tundra Advisory Sp. zo.o.

Vestas has signed V110-2.0 MW orders for a total of 950 MW in the United States since introducing the turbine on the market in April 2013, and is pleased to initiate its first project in Europe to utilise this new turbine model. The V110-2.0 MW turbine generates an annual energy production approximately 14 per cent higher than the V100-1.8 MW.

http://santamarta-florez.blogspot.com.es/2013/12/wind-energy-vestas-signs-first-wind.html

eólica Poland Polonia Vestas wind energy